Dinamap Pro 100V2 Manual de Serviço Página 74

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 104
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 73
4-22 PRO 100-400 V2 Patient Monitor Service Manual Revision A
2009829-001
Calibration & Maintenance: SECTION 4. GENERAL MAINTENANCE
8. Select Cal from the NIBP menu.
9. The Monitor displays “Set Pressure to 0 mmHg.”
10. Ensure calibration test equipment is at 0 mmHg.
11. Press Accept to continue or Cancel to quit this procedure.
12. The Monitor displays “Set Pressure to 200 mmHg.”
13. Apply the pressure (200 mmHg) and HOLD the pressure. Press
Accept to continue or Cancel to quit this procedure.
14. If Accept is chosen, the Monitor will vent the system to
atmosphere. Immediately prior to venting, the Monitor stores the set
pressure reading into system memory.
The zero reading and the 200 mmHg reading are the only points used
for calibration. It is important to ensure that the correct pressures are
applied at these two points.
After venting, the Monitor displays “Calibration is Complete” or
Calibration Failed.”
If the calibration fails, turn off the Monitor, check the calibration
equipment and repeat the process. Refer to a GE Medical Systems
Information Technologies service representative if calibration is still
unsuccessful. When the calibration is successful, the following will be
displayed on the LCD, “Wait...Storing values,” then after a few
seconds the LCD displays, “Turn Monitor off.” The PRO Monitor is
now accurately calibrated and can be switched off.
Check the calibration of the unit by repeating the BP-related
procedure in 4.6.3.
4.7.2. Overpressure Adjustment
This procedure describes how to set the overpressure thresholds.
See Fig 4-2 for adjustment locations.
Vista de página 73
1 2 ... 69 70 71 72 73 74 75 76 77 78 79 ... 103 104

Comentários a estes Manuais

Sem comentários